Back to Boat Return Checklist

MK3 Atlantic 85 Post Recovery Inspection

Complete the inspection checklist below. Outcomes and notes are editable.

1. On Recovery

0/2

Boat General

Action: Note Defects

Step 1Zone All

Boat General

Action: Note Equipment Used

Step 1Zone All

2. Wash Down — Rinse with Fresh Water

0/8

Hull Transom and Outboard Sponson

Action: Rinse with Fresh Water

Step 2Zone 1

Inboard Sponson and Attachments

Action: Rinse with Fresh Water

Step 2Zone 2

Deck and Fittings

Action: Rinse with Fresh Water

Step 2Zone 3

Foredeck Equipment

Action: Rinse with Fresh Water

Step 2Zone 5

Console

Action: Rinse with Fresh Water

Step 2Zone 6, 7 & 8

Aft Deck Equipment

Action: Rinse with Fresh Water

Step 2Zone 9

Roll Bar and Mast

Action: Rinse with Fresh Water

Step 2Zone 10

Outboard Motors and Steering

Action: Rinse with Fresh Water

Step 2Zone 11

3. Power & Flush

0/3

Cooling Water Intake

Action: Inspect

Step 3.1Zone 11

Distribution Box

Action: Inspect for Tripped Breakers

Step 3.3Zone 6

Outboards

Action: Flush

Step 3.2-3.6Zone 11

4. Systems Check

0/2

Displays (Raymarine, Tachos and SIMS)

Action: Power up, Inspect and Clean

Step 4.1Zone 6, 7 & 8

Navigation and Deck Lighting

Action: Function Test

Step 4.2Zone 6, 7, 8 & 10

5. Controls

0/2

Throttles and Gear Select

Action: Function Test (Shut Down)

Step 5.1Zone 6

Control Box

Action: Inspect

Step 5.2Zone 6

6. Fuel

0/4

Fuel Filter and Water Separators

Action: Inspect

Step 6.1Zone 7

Fuel Filler Cap

Action: Refuel

Step 6.2Zone 7

Fuel Tank

Action: Inspect

Step 6.2Zone 7

Fuel Dip Stick

Action: Inspect

Step 6.3Zone 7

7. Aft Deck Equipment

0/2

Bollard

Action: Free Movement

Step 7.1Zone 9

Steering By-pass Valve

Action: Functional Test

Step 7.2Zone 9

8. Roll Bar and Mast

0/2

Mast Hinges

Action: Inspect

Step 8.1Zone 10

Mast Locking Pins

Action: Inspect

Step 8.2Zone 10

9. Outboard Motors

0/2

Cooling Water Adaptors (Including Fishtails where Installed)

Action: Functional Test

Step 9.1Zone 11

IP (Inversion Proof) Test Buttons

Action: Inspect

Step 9.2Zone 11

10. General

0/6

Ropes (If Used)

Action: Rinse and Dry

Step 10.1Zone N/A

Ballast Tank (If Required)

Action: Refill

Step 10.2Zone 5

Shore Power

Action: Connect

Step 10.3Zone 6

Video Recorder (If Required)

Action: Download

Step 10.4Zone 10

Engine Running Hours (QR Code)

Action: Record

Step 10.5Zone 11

Salvage Pump (If Used)

Action: Flush

Step 10.6Zone N/A

Engine Hours & Comments

0/33 inspected · 0%